Name
Replacing XOS Workstations with Windows Thin Clients
Date
Friday, November 8, 2024
Time
9:00 AM - 9:40 AM (MST)
Description

In 2019 NTS has deployed a program called “Long Term Project”, which was very complex and challenging, and included: a new main Operational Control Center (OCC) and BCC. The project also considered and applied best practices and techniques, modern standards and guides. A central challenge was how to convert legacy serial modbus to a multi-master design to allow parallel polling between the old and new SCADA, all while not impacting operation and control of gas transportation in the most industrialized region of Brazil.

Click here to get the presentation slides.