The Hakodate Dock Co: Improving Electrical Work Efficiency with AVEVA Engineering and E3D
Location Name
Brown 1 - Level 2
Description

Hakodate Dock will present how they are improving electrical engineering efficiency by transitioning from manual and disconnected workflows to an integrated digital approach using AVEVA Engineering and AVEVA E3D.

Previously
●Electrical Diagrams : Created using Microsoft Visio. These diagrams are not integrated with other systems.
●Cable Tray Layout : Developed using 2D CAD, with interference checks performed manually.
●Cable Length : Calculated manually, resulting in high time and labour demands.

This session will highlight how adopting AVEVA solutions is helping streamline electrical design, 
improve coordination, and reduce manual engineering effort.