Infrastructure (Water, Cities, Transport, Marine)
Name
The Hakodate Dock Co: Improving Electrical Work Efficiency with AVEVA Engineering and E3D
Description

・Electrical Diagrams: Using Microsoft Visio

   The diagram has not been utilized in other systems.

・Cable Tray Layout: Using 2D CAD

  Interference is checked manually.

・Cable Length: Manual Calculation

  High time and labor demands. 

  Please refer to the attachment for details.