Infrastructure (Water, Cities, Transport, Marine)
Name
The Hakodate Dock Co: Improving Electrical Work Efficiency with AVEVA Engineering and E3D
Description
・Electrical Diagrams: Using Microsoft Visio
The diagram has not been utilized in other systems.
・Cable Tray Layout: Using 2D CAD
Interference is checked manually.
・Cable Length: Manual Calculation
High time and labor demands.
Please refer to the attachment for details.
Speakers