Name
Implementing decarbonization strategies, digitalization of domain expertise and predictive maintenance initiatives at Newmont Lihir Island Mine to enhance sustainability, workforce empowerment and operational efficiency using Mobile mining equipment data.
Time
1:30 PM - 2:00 PM
Process Industries (Chemicals, MMM, Pulp/Paper)
Description

Newmont has set absolute and intensity-based targets with a reduction of 32% for Scope 1 and 2 emissions and 30% for Scope 3 emissions by 2030, with the goal to be carbon neutral by 2050. To increase the competitive advantage across market segment, increasing uptime and availability of HME equipments thus to increase the production is a key. To achieve these targets along with aging workforce and introduction of the new workforce, need of the digital data platform who can provide real time insight is key.  

To achieve this, Newmont’s reliability team along with the AVEVA Partner CereBulb has utilized the AVEVA PI System as well as integration with Equipment telematics system, Fleet Management System as well as ERP (SAP) System to implement the solution.

The Solution has yielded the reduction of the 1% fuel usage as well as increase availability of the equipments by 3% as well as aided